Review the programme
We establish the build stage, site readiness, access and the intended handover date. This gives the discussion a practical starting point, focused on the priorities that matter to your organisation.

From completed build to a considered handover.
Builders’ and final presentation cleans following new builds, refurbishments and major property works.
A service shaped around you
Post-construction cleaning helps prepare a completed space for its first users. We agree the cleaning stages around the programme, site condition and the detail required for handover.
Developers, building contractors, refurbishment teams and property owners preparing completed or substantially finished spaces for occupation. The proposed cleaning stages take account of returning trades, access and presentation priorities, helping your team coordinate the transition from construction to use.

The scope of your service
The final scope is agreed for your premises. These are the areas we can discuss when shaping your service. Select an area below to explore what can be included.

Agreed removal of construction dust and cleaning residue from accessible surfaces once the area is ready for cleaning. Timing is agreed against the programme, with the condition of each area informing the cleaning methods and resources required.
Attention to agreed doors, frames, skirting, fixtures and other accessible finished surfaces, with suitable methods for new materials. Materials and finishes are reviewed before work begins, with any delicate surfaces or manufacturer instructions identified in advance.
Cleaning of installed facilities and finished floors within the agreed scope, taking account of manufacturer care requirements. Access and readiness are confirmed for each area, alongside the finish required and any limitations arising from ongoing works.
A finishing clean close to handover, with attention to visible detail after the main works and agreed trades activity are complete. We agree the priority areas with your site contact and identify any further work that may affect presentation.
Confirm that areas are ready for cleaning, with safe access, utilities and arrangements for remaining trades. Responsibilities are agreed before the visit so cleaning can be coordinated with the wider handover programme.
We establish the build stage, site readiness, access and the intended handover date. This gives the discussion a practical starting point, focused on the priorities that matter to your organisation.
We define what each visit includes and how returning trades or further works may affect the finish. The proposed specification makes responsibilities and exclusions clear, with any additional requirements confirmed separately.
We complete the agreed work and review the result with the nominated site contact. Communication and next steps are agreed with your nominated contact, providing clarity around the proposed arrangement.
Useful to know
Have a requirement that is not covered here? Tell us about your premises and what you need to achieve.
View all cleaning services ↗For background on coordinating contractors and site responsibilities, see HSE’s guide to managing contractors.
Post-construction cleaning addresses the dust and residue associated with building work. Property preparation usually resets an already occupied or furnished space between stays or uses.
Bulk construction waste, rubble and skips are not assumed to be part of the cleaning scope. Any removal requirements must be discussed and agreed separately.
We can discuss a separate finishing visit. Its timing and scope should reflect the remaining works and the condition of the site.
Contact us once the likely programme and areas are known. We review readiness, access and remaining works before confirming cleaning stages, availability and the proposed quotation.
Please identify delicate materials and provide relevant care instructions. The agreed cleaning methods take account of surface suitability, with uncertain or specialist requirements clarified before work is accepted.
We agree access, utilities and the condition in which areas will be presented. Remaining materials, waste and other contractors are discussed so responsibilities and the cleaning sequence are clear.